Construction of a new terminal with infrastructure and equipment is a part of the project POIS.06.03.00-00-001/09-00 for the Project „Wrocław Airport – extension and modernization of airside and landside infrastructure” within the frameworks of the task 6.3 Development of air network TEN-T, piority VI Road and air network TEN-T, Operational Programme Infrastructure.
POIS.06.03.00-00-001/09-00 for the Project „Wrocław Airport – extension and modernization of airside and landside infrastructure” within the frameworks of the task 6.3 Development of air network TEN-T, priority VI Road and air network TEN-T, Operational Programme Infrastructure. The financing is defined in advance and amounts to 128 110 000,00 zł.
The object of the project is the construction of a new passengers terminal with airside and landside infrastructure which provides the increase of the capacity up to 3,3 mln passengers per year, of the airport located in TEN-T network and the capacity of Polish airspace as well as providing the high quality of services.
The Project includes the following investments:
- Construction of terminal 2, which includes:
- Construction of the technical infrastructure network connected with terminal 2,
- Construction of the airport surfaces.
Estimated total cost of the Project amounts to 381 055 359,06 zł and includes the eligible costs amounting to 277 108 514,87 zł.